Driveway and Yard Clean Up

July 02, 20261 min read

Driveway upgrade

Project: Driveway restoration

Location: South Invercargill

Timeframe: 2 days

These new clients were getting a little tired of the mud around their driveway and traipsing it into the house. So, we came in and removed the muddy surface and reshaped the driveway to allow any water to track away from drive. After this we recovered the driveway with new gravel and then using a roller to compact and to seal up the surface. This left a fantastic new driveway with no more mud. These clients were very happy with the result.

blog author avatar
John is owner operator of JK's Mini Digger
Back to Blog